Tag: School


Showing 8 articles.


The Illusion of Stewardship: Bankruptcies, Budgets, and Sherman’s $42.8M Trap

Saturday, March 14, 2026

A local administration manufactured a public safety panic over a drone. The real threat, however, lies in the town ledgers—where years of deferred maintenance and a hidden $2.3 million surplus quietly laid the groundwork for a generational tax burden.

A Tale of Two Snowstorms: Transparency, Steel, and Sherman’s Missing Construction Logs

Friday, March 6, 2026

First Selectman Don Lowe uses winter weather to boast of construction progress to the press while simultaneously citing it as a legal defense to withhold public records from the state.

The Art of Demolition by Neglect: A $5.6M Surplus and a $42.8M Crisis

Thursday, February 19, 2026

How does a town sitting on a $5.6 million surplus suddenly need a $42.8 million blank check? We expose the decade-long strategy of "demolition by neglect" that starved the Sherman School to build a political rainy-day fund—and the fiscal hostage situation that forced taxpayers to foot the bill.

Intimidation at the Driveway: Weaponizing 911 in Sherman

Wednesday, February 11, 2026

It started with a drone photographing an exposed $42.8 million roof. It ended with a State Trooper parked in a private driveway. Sherman News reveals how town officials huddled at Town Hall to dispatch law enforcement and file baseless FAA complaints in a desperate attempt to silence transparency.

The Sherman Paradox: A $50M Crisis and a 55% Raise

Monday, February 9, 2026

A $50 million town asset left exposed to freezing winds. A residential neighborhood flooded with industrial light. And a First Selectman whose salary climbed 55% while the construction budget spiraled. We investigate the "White Lantern" anomaly and the fight for accountability on Sawmill Road.

Progress at Sherman School

Wednesday, September 3, 2025

From above, the scene at Sherman School tells a story of anticipation. Fresh aerial images taken by a professional drone pilot reveal the campus ringed by fencing, with industrial-sized dumpsters stationed like sentries around its perimeter.

Sherman Weighs Extra $6.5M for School

Friday, August 15, 2025

Sherman voters will head to the polls on August 23 to decide whether to approve an additional $6.5 million for the “renovate as new” Sherman School project. The request comes after construction bids exceeded the original budget by millions, prompting concerns over the financial planning of the Board of Selectmen and Board of Education.

Town Members Claim BOS Malfeasance

Friday, August 1, 2025

Sherman officials approved $4.3 million in school renovation spending at a hastily warned meeting, despite an $8 million budget gap and no voter approval. Critics call the move reckless, citing a lack of transparency, safety concerns, and legal violations. With the project already over budget and behind schedule, residents fear the town is beyond the point of no return—raising serious questions about oversight and public trust.